Inside ETS, the laying and connection of the cable driven a long way. We also have the walls completely covered with Lebast Lehmorange clay panels and then plastered with the assistance of master painter Claudius Kurtz with clay plaster.
Jens Kuhlmann The company has occupied the area in front of the terrace of the OpenOffice Schellevis plates and thus completed the landing. On the north side Kuhlmann staircases Schellevis plates created and planted around the OpenOffice lawn.
be this week mainly the work on the insulation with Porextherm vacuum panels to cover, roof, floor and terrace continued.
For more photos please click
0 comments:
Post a Comment